Project subject
Procurement of equipment, materials, execution of construction, mechanical and assembly works, functional testing and commissioning of equipment and installations, which includes the construction of a truck and tank wagon transfer station with accompanying infrastructure and reconstruction of the facility and installations with accompanying infrastructure.
Client
Oil Industry of Serbia
Location
Storage of petroleum products in Nis
Year
2023 / 24
Service
Industrial construction
Specific jobs
About 130 employees, about 20 units of construction machinery are employed on this project on average per day: cranes, excavators, combined machines, forklifts, telehandlers, tipper trucks, mobile hydraulic platforms and other construction machinery. So far, more than 250,000 working hours have been realized without injury.
Truck transfer station
Highlight for biocomponents and ethanol
Tank wagon unloading point
HC gas recovery unit – VRU
Tanks for ED R-8 and R-9 with a capacity of 5000 m3 each
Tank for BMB R-10 with a capacity of 5000 m3
Tanks for ethanol R-11 and R-12 with a capacity of 100 m3 each and tanks for biocomponents R-13 and R-14 with a capacity of 500 m3 each
Tank for firefighting water R-16 with a capacity of 1500 m3
Two tanks for additives with a capacity of 10 m3 each with 4 chambers
Concrete platform for storage of plastic IBC containers for additives – 4x1m3
Above-ground tanks of markers R-M1/M2 0.5m3/1.5m3
Pump stations for additives and biocomponents
Slop tanks R-S1/S2/S3/S4 – 4×10 m3
Pumping station for petroleum products
Dispatch center
Fire pump station
Complete fire protection system
Hydrant network
Water pumping station