In addition to our selected references, we've built a strong reputation over 20+ years of successful operations by delivering more than 300 other projects.

  • Delivery and installation of the R5 dehydrator tank at SS1-NP Elemir
  • Fabrication and installation of the R1 vertical above-ground dehydrator tank at SNGS Itebej
  • Pipeline installation works for raw water from point C7 to point A at the Pančevo Oil Refinery
  • Reconstruction of the Autoloading Station, Phase III, in the “Processing” block at the Pančevo Oil Refinery
  • Reconstruction of tanks and technological systems for the transportation of crude oil in sections 71 and N5/N6
  • Procurement, delivery of equipment and materials, design and engineering services, and execution of works for the fuel gas impurity catcher installation project for units S-0250/0290 at the Pančevo Oil Refinery
  • Procurement, delivery, design and execution of works for the construction of a high-pressure compressor station at NGP Velebit
  • Installation and connection of pump GA-3607/C for liquid phase extraction from vessel FA-3606 for NIS a.d. – Refining Block – Pančevo Oil Refinery
  • Replacement of the pump and steam turbine motor on GA 2302 and GA 2305 at the Pančevo Oil Refinery
  • Construction of a connection pipeline, evaporator-reduction station, and gas-steam plant – Phase 1 of the ŠFLU Processing Facility in Odžaci
  • Relocation of the air intake system for combustion on the S-210 compressor engine at PSG Banatski Dvor
  • Construction of pipe systems over the pipe bridge, nitrogen and air line connections, and wastewater piping from the boiler room and HPV – Phase 1 of the ŠFLU Processing Facility in Odžaci
  • Delivery of equipment and materials, design and other services, and execution of works for the Hydrogen Loss Elimination project at the Pančevo Oil Refinery
  • Equipment procurement, design, and construction of a pressure-boosting compressor station at the Oil & Gas Processing and Transport Plant, NIS a.d. Exploration and Production Block
  • Procurement and installation of a 500kW container-type boiler plant in Majdan, Novi Kneževac Municipality
  • Procurement of materials and construction of the R-2 storage tank at SNGS Srpski Itebej
  • Replacement of the raw water pipeline
  • Procurement of equipment and materials, design and execution of infrastructure reconstruction works at MGP Elemir
  • Rehabilitation of tanks R-6 and R-7 at UOS Nadrljan
  • Rehabilitation of tanks R-1/R-3/R-4 at SOS Kg Kikinda
  • Adaptation of the oil pumping system in RNP
  • Connection of a package boiler plant at OS Jermenovci
  • Adaptation of the natural gas heating system S-9900, S-9950, and gas flow regulation on S-9900
  • Procurement, delivery of equipment and materials and provision of services and execution of works for the project – Execution of works on investment maintenance of heating of buildings and facilities using the heat of the condensate of Blaoka V in the Pančevo Oil Refinery
  • Construction of a tollbooth and fire station in Kasidol
  • Construction of a fire protection system – NP Kasidol
  • Rehabilitation and recultivation of facility SS Majdan-X-1
  • Design documentation, procurement, and execution of works for FCC unit reconstruction – increasing hot feed ratio and UCO preheating, turnkey project
  • Replacement of gasoline line from the separator unit to gasoline tanks at SGS Srpska Crnja
  • Introduction of hydrogen-rich gas from unit S-300 as feedstock for S-5000
  • Optimization of steam lines in the handling area – Pančevo Oil Refinery
  • Adaptation of the condensate return system in the Novi Sad power plant
  • Rehabilitation of auxiliary heating lines in the Ethylen, Energetika, Pevg and Peng factories in Pančevo and rehabilitation of steam and auxiliary heating lines in FSK
  • URP reconstruction of shut-off valves on the Nadrljan–Novi Sad oil pipelines – Installation of ON-OFF valves with extended stems at the designated project locations
  • Repair of tanks R-2/R-5/R-6 at SOS Kg Kikinda – CO₂ separation from natural gas
  • Repair of tanks R-1 and R-3 at OS Jermenovci
  • Extension of ME Velebit-3 – Connecting ME Velebit 3B with the heat accumulator and boiler room
  • Installation and connection of container-type dosing pumps at UPS Block production facilities
  • Repair of the hydrant network at the LPG storage in Zrenjanin
  • Repair of tanks R2 and R5 at OS Jermenovci
  • Pipework reconstruction using materials for a section of the thermal oil pipeline, including installation of shut-off and stop valves in PVC4m plant
  • Extension of the fire protection system at SNGS Itebej
  • Procurement of materials, reconstruction, and commissioning of gathering station LOT 1 – OS Jermenovci
  • Replacement of heat exchanger – PITNIG plant Elemir
  • Procurement of materials and execution of works for the connection and installation of heat exchanger E1-2625
  • Replacement of steam pipeline in the Pančevo power plant and replacement of valves, drainage system, and flanges on FR-9511 and PV-039
  • 160MW Combined Cycle Power Plant Project, Pančevo, Serbia – Execution of works on the underground pipeline for the metering and regulating gas station
  • Procurement of materials and execution of works to expand the 6-SM-25-1316 steam line at the FCC complex entrance
  • Procurement of materials, reconstruction, and commissioning of gathering station LOT 2 – SS-1 Jermenovci
  • Procurement of equipment and materials and execution of works on the project: Rehabilitation of the ion-exchange resin regeneration system at the 2×200 m³/h plant
  • 160MW Combined cycle power plant project, Pančevo, Serbia – Execution of works on the aboveground pipeline for the metering and regulating gas station
  • Procurement of equipment and materials, execution of works, and as-built project documentation for: Installation of bottom-loading arms for aromatic products at the railway loading terminal – Pančevo Oil Refinery
  • Installation of additional heaters on the 16″ waste gas line from S-2450 to S-4450
  • Repair of the 10″ steam pipeline RNP–HIP Petrohemija SS 9500-150 from PV 025 to the TE-TO Pančevo connection point (LOT 1), and repair of the same pipeline section (LOT 2)
  • Procurement of equipment and materials, execution of works, and preparation of as-built documentation for the project “Adjustment of the jet fuel system with the requirements of the EI/JIG 1530 standard”
  • Procurement of materials and equipment, and execution of works for the project “Bringing Natural Gas to Unit S-2450 at the Pančevo Oil Refinery”
  • Repair of the Dopol tower
  • Connection of the flare at Velebit – Reconstruction of the gas section of SS1 Velebit
  • Pipeline rerouting at SNGS Rusanda
  • Construction of DN150 and DN65 pipelines for CO₂ transport
  • Tank repair at SOS Bradarac
  • Distribution gas pipeline RG 09-04/2 Aleksandrovac – Kopaonik – Novi Pazar – Tutin
  • High-pressure gas pipeline ANSI 300, RG 04-05 in the Municipality of Inđija
  • High-pressure gas pipeline Pećinci DN200
  • Medium-pressure gas pipeline Odžaci DN80–DN150
  • Gas pipeline at Pančevo Refinery DN400
  • Medium-pressure gas pipeline Sombor DN150–DN200
  • High-pressure gas pipeline Subotica DN150
  • Overhaul and servicing of cylinder filling stations at LPG storage facilities in Subotica and Čačak
  • Gas pipeline Titel DN80–DN150
  • Medium-pressure gas pipeline Vilovo–Titel–Industrial Zone, First Zone South
  • Medium-pressure gas pipeline Pančevo DN150
  • Medium-pressure gas pipeline Kula DN50–DN250
  • Medium-pressure gas pipeline Kovačica DN80–DN150
  • Medium-pressure gas pipeline Kovačica–Debeljača–Opovo DN150
  • Gas pipeline Bela Crkva DN50–DN150
  • Medium-pressure gas pipeline Bela Crkva–Crvena Crkva–Vračev Gaj–Banatska Palanka–Jasenovo
  • High-pressure gas pipeline from SS1 Velebit to MG-07 DN150
  • Construction of gas pipeline from SS1 Velebit to MG-07
  • Wellhead pipelines Velebit, Kikinda, Turija, Nadrljan
  • Construction of pipeline passage SS-1 Jermenovci – OS Jermenovci beneath the DTD canal – including MMR, GR, EER, Cathodic protection, and Fire protection systems
  • Mechanical, insulation, and civil works for reconstruction of the district heating network in Partizanskih Baza Street, from manhole 3-29 to Braće Dronjak Street, with block distribution, Novi Sad
  • Mechanical, insulation, and civil works for reconstruction of the district heating network in the block of Marodićeva, Bogdana Garabantina, and Sestara Ninković Streets, Novi Sad
  • Mechanical, insulation, and civil works for reconstruction of the district heating network from manhole 414 in the block of Dušana Vasiljeva and Episkopa Visariona Streets, Novi Sad
  • Mechanical, insulation, and civil works for reconstruction of the district heating network in the block of Bulevar Kralja Petra I 19–23, Bulevar Oslobođenja 24–46, and Branimira Ćosića 42–48, Novi Sad
  • Mechanical, insulation, and civil works for reconstruction of the district heating connection – reconstruction of the heating line in Danila Kiša Street, numbers 25–45, Novi Sad
  • Mechanical, insulation, and civil works for reconstruction of the district heating pipeline from Futoški Put, manhole Z-19, to Anđe Ranković Street, Novi Sad
  • Mechanical, insulation, and civil works for reconstruction of the district heating pipeline from Svetozara Ćorovića, manhole Z-28, to Stevana Hristića 17–25, Novi Sad