Project subject
Connecting the storage wells with the collector of the Banatski Dvor underground gas storage.
Client
Energotehnika Južna Bačka
Locations
Banatski Dvor
Year
2011
Service
Special purpose facilities
Specific jobs
As part of the planned works, the construction of high-pressure pipelines with a diameter of 114.3 mm SCH160, Class ANSI 1500, designed for a working pressure of up to 180 bar, was realized. The pipeline connects the well bushes to the collector, allowing for optimal flow and storage capacity functionality.
The total length of the planned pipeline is 6.1 kilometers, and its realization contributes to improving the reliability and efficiency of the underground gas storage.